Industrial & logistics • Pedro Juan Caballero

Frigonorte PJC

Large-plan commercial-industrial infrastructure in Pedro Juan Caballero: glazed façade, steel structure and operational scale.

Frigonorte PJC, view
Project sheet

Project story

Year
2024
Area
To be confirmed
Location
Pedro Juan Caballero
Status
Under construction / handover

Commercial/industrial infrastructure. Location inferred from the PJC acronym → Pedro Juan Caballero.

01 · Challenge

What had to be solved

To resolve a large-scale project with structural efficiency, programme and a contemporary commercial image on an operational plot.

02 · Concept

The idea behind the project

A linear volume with a wide floor plate, floor-to-ceiling windows and a clean envelope thought for operations, visibility and future growth (including a frame for signage).

03 · Construction

How it is built

Delivery of structure, enclosures, large-format joinery, renders and façade preparation. Photographic record of a real site on Paraguayan ground.

Key points

What we resolved on this project.

  • Industrial-commercial scale
  • Continuous glazed façade
  • Presence in Pedro Juan Caballero
  • 10 photographs of the real site
Materiality

Materials and finishes.

Decisions you see and touch: what holds daily use and time.

  • Concrete
  • Steel structure
  • Large-format glass
  • Panels / render
  • Façade metal frame
Frigonorte PJC, detail
Other projects

Keep exploring the portfolio.

A similar project

Want to build something at this scale or level of detail?

Let's talk about the site, the brief, the budget and the best way to start.

Talk to MU